Dust Control

Exploration & Production

Dust control programs are designed for the traffic and duration of each exploration and production phase.

Midwest Industrial Supply, Inc. technology · Canton, Ohio · Since 1975

Overview

Exploration and production operations mobilize dozens of trucks daily. Treatment design must address temporary road requirements.

We formulate treatments calibrated to the phase duration (drilling, completion, testing) to maximize cost/performance ratio.

Our approach

An Engineered Method, Calibrated for African Terrain

Each engagement begins with soil characterization: gradation, fines content, plasticity and moisture. Traffic, climate and logistical requirements determine the formulation. Mix designs are tested in the laboratory of Midwest Industrial Supply, Inc.

Our engineers work with HSE, production and maintenance teams. Objectives are measurable: PM10 reduction, watering cycle control, transport continuity and operating costs.

The 30-day trial provides performance data from your site. Bearing-capacity measurements, traffic counts and air sampling document treatment before large-scale deployment.

Process

From Audit to Measured Performance

1. Site Diagnostic

Soil sampling, traffic counts, climate and logistics assessment for your site.

2. Formulation

Selection and dosage of the Midwest solution for the objective: soil stabilization, fines preservation or dust control.

3. Application

Controlled spreading, in-situ mixing or topical spray depending on the solution. Schedule kept.

4. Monitoring & Warranty

30-day on-site trial, dust and bearing-capacity measurements, then a multi-year performance contract.

Midwest figures

Performance Published by Midwest

80–95%
Reduction in dust levels for nearby residents
Over 50%
Lower maintenance costs vs watering
1 to 3 years
Long-term effectiveness under heavy traffic
30 days
Supervised trial on your own site
Why Midwest Africa

A Method Designed for Infrastructure Programs

  • Midwest Industrial Supply soil science — founded in 1975, first serving mines — applied to African laterites and soils.
  • A supervised 30-day trial on your own site, co-developed with your teams before any large-scale rollout.
  • Non-toxic, biodegradable products, safe for inhabited areas and neighboring crops.
  • Performance-based contracts: we commit to measurable KPIs, not liters delivered.
Related solutions

Dust Control

Engineer Your Infrastructure Program

Ministries, road agencies, mining groups and civil engineering contractors: our engineers analyze your soils and design the solution suited to your program within 15 days.

Request a quote