Mining

Haul Roads

We engineer haul roads for large mining operations. Design objectives address production cycles, tire life and fuel consumption.

Midwest Industrial Supply, Inc. technology · Canton, Ohio · Since 1975

Overview

A mining haul road is the single largest cost driver in an operation. Corrugations, ruts and dust each cost in tires, fuel, cycle time and truck availability.

We size the structure, treat the running course and supervise construction to guarantee IRI roughness indices in line with international standards.

Our approach

An Engineered Method, Calibrated for African Terrain

Each engagement begins with soil characterization: gradation, fines content, plasticity and moisture. Traffic, climate and logistical requirements determine the formulation. Mix designs are tested in the laboratory of Midwest Industrial Supply, Inc.

Our engineers work with HSE, production and maintenance teams. Objectives are measurable: PM10 reduction, watering cycle control, transport continuity and operating costs.

The 30-day trial provides performance data from your site. Bearing-capacity measurements, traffic counts and air sampling document treatment before large-scale deployment.

Process

From Audit to Measured Performance

1. Site Diagnostic

Soil sampling, traffic counts, climate and logistics assessment for your site.

2. Formulation

Selection and dosage of the Midwest solution for the objective: soil stabilization, fines preservation or dust control.

3. Application

Controlled spreading, in-situ mixing or topical spray depending on the solution. Schedule kept.

4. Monitoring & Warranty

30-day on-site trial, dust and bearing-capacity measurements, then a multi-year performance contract.

Midwest figures

Performance Published by Midwest

Up to 80%
Dust control on haul roads
12–24 → 1–2
Applications per day: water vs Midwest product
30 days
Supervised trial on your own mine site
1975
Year Midwest Industrial Supply was founded
Why Midwest Africa

A Method Designed for Infrastructure Programs

  • Midwest Industrial Supply soil science — founded in 1975, first serving mines — applied to African laterites and soils.
  • A supervised 30-day trial on your own site, co-developed with your teams before any large-scale rollout.
  • Non-toxic, biodegradable products, safe for inhabited areas and neighboring crops.
  • Performance-based contracts: we commit to measurable KPIs, not liters delivered.
Related solutions

Mining

Engineer Your Infrastructure Program

Ministries, road agencies, mining groups and civil engineering contractors: our engineers analyze your soils and design the solution suited to your program within 15 days.

Request a quote