Dust Control and Dust Suppression in Africa
Up to 95% less dust on mining roads, rural roads, construction sites, airfields and industrial facilities.
Midwest Industrial Supply, Inc. technology · Canton, Ohio · Since 1975
Applications by Sector
Iron & Steel Mills
Dust control on internal steel-mill haul lanes.
Rural Roads & Municipalities
Dust control designed for rural road networks.
Gravel Runways
Stabilization for regional gravel airstrips.
Villages & Communities
Non-toxic solutions for inhabited areas.
Exploration & Production
Road treatments for oil & gas E&P sites.
Stockpiles
Anti-erosion crust on open-air stockpiles.
Construction Sites
Dust and erosion control during construction.
Material Handling
Dust control at transfer points.
Vineyards
Clean, non-toxic vineyard tracks.
Pipeyards & Storage Areas
Stabilized, drivable, dust-free industrial yards.
Military Sites
Tank trails, helipads and forward bases.
Solar & Wind Farms
Maintenance tracks and anti-soiling for panels.
The Explanatory PDF for This Solution
Download the matching technical documentation: principles, dosage rates and measured results.
Dust Palliative & Fines Preservation
Application program, operational benefits and impact on road maintenance.
Fines Preservation
Why losing fines destroys a gravel road, and how to stop it.
Frequently Asked Questions
Is watering enough to control dust?
Watering alone is no longer enough. With concentrated DustPro additive in every tanker, passes drop from 6-10 a day to 1-2, using about 75% less water.
Which dust control programmes do you offer?
Three programmes: managed service (Midwest handles everything), guided application (your crews apply EnviroKleen® with training and support) and enhanced watering with DustPro.
What results can we expect?
A US EPA study at two steel mills measured over 90% PM10 and over 75% PM2.5 reduction at 30 days. A Desert Research Institute and CARB study measured 98% at 3 months and 90% at one year.
Is EnviroKleen® a stabilizer?
No. EnviroKleen® is designed for fines preservation and dust control. Soil stabilization is handled by Soil-Sement® Engineered Formula.
How do we get started?
Midwest follows four steps: discover, diagnose, design, deliver. The right programme depends on your staff, equipment and reporting obligations; start with a trial area, then expand.
Further Reading
Engineer Your Infrastructure Program
Ministries, road agencies, mining groups and civil engineering contractors: our engineers analyze your soils and design the solution suited to your program within 15 days.

