Dust Control

Gravel Runways

Turbines suck up fines. We treat gravel airstrips to eliminate FOD and dust at takeoff.

Midwest Industrial Supply, Inc. technology · Canton, Ohio · Since 1975

Overview

On regional airfields, an untreated gravel runway throws dangerous FOD and lifts massive dust during takeoff.

The Midwest treatment binds the surface without reducing bearing capacity, keeps the laterite tone and meets flight-operations criteria.

Our approach

An Engineered Method, Calibrated for African Terrain

Each engagement begins with soil characterization: gradation, fines content, plasticity and moisture. Traffic, climate and logistical requirements determine the formulation. Mix designs are tested in the laboratory of Midwest Industrial Supply, Inc.

Our engineers work with HSE, production and maintenance teams. Objectives are measurable: PM10 reduction, watering cycle control, transport continuity and operating costs.

The 30-day trial provides performance data from your site. Bearing-capacity measurements, traffic counts and air sampling document treatment before large-scale deployment.

Process

From Audit to Measured Performance

1. Site Diagnostic

Soil sampling, traffic counts, climate and logistics assessment for your site.

2. Formulation

Selection and dosage of the Midwest solution for the objective: soil stabilization, fines preservation or dust control.

3. Application

Controlled spreading, in-situ mixing or topical spray depending on the solution. Schedule kept.

4. Monitoring & Warranty

30-day on-site trial, dust and bearing-capacity measurements, then a multi-year performance contract.

Midwest figures

Performance Published by Midwest

Up to 95%
Dust and water reduction (Midwest program)
1 to 3 years
Long-term effectiveness of fines preservation
30 days
Supervised trial on your own runway
1975
Year Midwest Industrial Supply was founded
Why Midwest Africa

A Method Designed for Infrastructure Programs

  • Midwest Industrial Supply soil science — founded in 1975, first serving mines — applied to African laterites and soils.
  • A supervised 30-day trial on your own site, co-developed with your teams before any large-scale rollout.
  • Non-toxic, biodegradable products, safe for inhabited areas and neighboring crops.
  • Performance-based contracts: we commit to measurable KPIs, not liters delivered.
Related solutions

Dust Control

Engineer Your Infrastructure Program

Ministries, road agencies, mining groups and civil engineering contractors: our engineers analyze your soils and design the solution suited to your program within 15 days.

Request a quote