Dust Control

Military Sites

Reduced dust signature for helicopters and armor. Forward bases kept operational.

Midwest Industrial Supply, Inc. technology · Canton, Ohio · Since 1975

Overview

Tank trails and helipad zones generate a dust signature that reveals position and damages engines. Our treatments cut that signature by 90%.

Midwest solutions are designed for operational areas and internal roads at forward bases.

Our approach

An Engineered Method, Calibrated for African Terrain

Each engagement begins with soil characterization: gradation, fines content, plasticity and moisture. Traffic, climate and logistical requirements determine the formulation. Mix designs are tested in the laboratory of Midwest Industrial Supply, Inc.

Our engineers work with HSE, production and maintenance teams. Objectives are measurable: PM10 reduction, watering cycle control, transport continuity and operating costs.

The 30-day trial provides performance data from your site. Bearing-capacity measurements, traffic counts and air sampling document treatment before large-scale deployment.

Process

From Audit to Measured Performance

1. Site Diagnostic

Soil sampling, traffic counts, climate and logistics assessment for your site.

2. Formulation

Selection and dosage of the Midwest solution for the objective: soil stabilization, fines preservation or dust control.

3. Application

Controlled spreading, in-situ mixing or topical spray depending on the solution. Schedule kept.

4. Monitoring & Warranty

30-day on-site trial, dust and bearing-capacity measurements, then a multi-year performance contract.

Midwest figures

Performance Published by Midwest

< 20 %
Opacity of convoy dust plumes (required threshold)
30 days
Duration of efficacy studies on helipads and base camps
100%
Midwest stands behind its products
8 miles
NaturalPave® military roadway (Twentynine Palms, USMC)
Why Midwest Africa

A Method Designed for Infrastructure Programs

  • Midwest Industrial Supply soil science — founded in 1975, first serving mines — applied to African laterites and soils.
  • A supervised 30-day trial on your own site, co-developed with your teams before any large-scale rollout.
  • Non-toxic, biodegradable products, safe for inhabited areas and neighboring crops.
  • Performance-based contracts: we commit to measurable KPIs, not liters delivered.
Related solutions

Dust Control

Engineer Your Infrastructure Program

Ministries, road agencies, mining groups and civil engineering contractors: our engineers analyze your soils and design the solution suited to your program within 15 days.

Request a quote